To achieve this, SLG worked closely alongside Arrol & Snell and a specialist building company to construct the core lift site in a way that would complement the environment it served.
Key features of the installation include a handrail, consisting of 15mm thick flush glass panels, which sits with a stainless steel tubular rail and a central vertical rectangular post. One side of the lift houses the control panel, while the opposite holds the load plate. In keeping with the location it serves, the lift is painted to a standard RAL 7030 stone grey.
Hymo commented that the installation was an interesting and rewarding project that enabled the company to demonstrate its capabilities for delivering highly specialised, lifting solutions.