Nature Group’s Port Reception Facilities collect and treat more than 200,000 m3 of offshore waste every year.
In this latest facility, the Babcock Wanson boiler is used to pre heat the tanks containing the wastewater, up to 100°C at 5 bar pressure, before it enters the treatment process. The treated water is safely discharged into the sea whist the recovered oil is fed back into the process to fuel the hot water boiler for maximum efficiency.
t: 020 8953 7111
e: info@babcock-wanson.co.uk
Click here for the full unedited version of the release as provided by the company